Promoted
Measure HLA at Two Years: a Timeline of How L.A. City has Resisted Safer Multimodal Streets
With just 300 feet of HLA upgrades in two years, L.A. City's main effort has been to actively block HLA progress
SGV Connect 146: What’s Next for the Foothill Gold Line Construction Authority
CEO Habib Balian joins SGV Connect to discuss the A Line’s steady ridership, transit-oriented development along the corridor, and the shift to a new delivery model for the long-anticipated Claremont extension.
New UCLA Report Looks into the High Cost to Build Parking
For new apartments, the research found that building required parking adds roughly $50,000 to $100,000 per unit, and disproportionately increases the cost to build smaller apartments
“Disrespectful” and “infuriating”: L.A.’s progress on making streets safe and accessible for disabled people stalled for decades
Curb ramps have been required when repaving a street since 1992. Why is L.A. only now saying it must follow the law?
SGV Bus Rapid Transit Gets Another $3.9M for Study and Design
Early improvements combine for about 14 miles of continuous bus lanes, expected to be installed in advance of the 2028 Olympic games
Metro D Line Subway Extension Will Open Friday May 8
Subway riders will be able to travel from Beverly Hills to Downtown L.A. in just 20 minutes
Metro Committee Approves Additional Early Construction Funding for Union Station Run-Through Tracks
Link US is a huge undertaking which includes building a new bridge over and along the 101 Freeway
Updates on L.A. City Stopping Resurfacing, Instead Doing “Large Asphalt Repair”
Bureau of Street Services GM states that budget cuts forced them to pivot to "large asphalt repair." That practice ends up resurfacing streets partially, ineffectively, and inefficiently.
L.A. Seeks Input on Proposed Speed Camera Locations
L.A. is planning 125 speed camera systems citywide - location criteria includes histories of speeding/crashes/racing, areas with concentrated vulnerable populations, etc.
Eyes on the Path: L.A. City Adding New Access Points to Chandler Path
New accessible ramp under construction at Strohm Avenue









