Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In

Promoted

Metro and Caltrans Break Ground on 105 Freeway Expansion

105 Freeway expansion is touted as "leaving a lasting legacy for Angelenos for decades to come" but it might not be the legacy that Metro and Caltrans think it is

April 25, 2025

Metro LAX Transit Center Station to Open June 6

The LAX Transit Center will serve the C and K light rail lines, connect to the future LAX people mover, plus includes bus/bike/walk hubs

April 24, 2025

Eyes on the Street: New Protected Bike Lane on San Vicente Blvd

San Vicente's new stretch of parking-protected bike lane extends a half mile, from Keniston Avenue to Redondo Boulevard

April 23, 2025

Freeway Updates: 91 Widening, Repave 405, and 105 Safety Fixes

A Metro/Caltrans 91 Freeway expansion project is on hold. Caltrans 105/Studebaker safety enhancements are complete. Caltrans is planning $144M worth of repaving and upgrading for the 405 through the Sepulveda Pass.

April 22, 2025

Deadline For Input on SGV Greenways Implementation Plan is Saturday

The 200+ page document provides a comprehensive look at how the region’s flood control channels can be remade into walk/bike paths

April 21, 2025

Caltrans Posts Draft Master Plan for PCH in Malibu

Activists agree this plan is a huge improvement over current conditions, but there are some areas where it could be even better.

April 16, 2025

New Bike Lanes on Mission Road and Bonnie Brae Street

New bike lanes are complete on Westlake's Bonnie Brae Street. New partially-protected bike lanes are being installed on Mission Road in Boyle Heights.

April 15, 2025

Eyes on the Station: Fortified Fare Gates Now Arriving at Metro Stops

Streetsblog visited Pasadena's Metro A Line Lake Street Station and brings you photos of the new fare gates. Metro is installing more secure gates at more than a dozen rail stations.

April 11, 2025

City Transportation Department Launches Required HLA Website, but It’s Problematic

LADOT's Measure HLA dashboard shows just seven projects, all of which LADOT claims are exempt from Measure HLA requirements

April 9, 2025