Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Streetsblog USA

Boston Tests Faster Bus Service Simply By Laying Out Orange Cones

Boston set up a bus lane using orange cones. Photo: Jacqueline Goddard

On a typical weekday, bus riders make 19,000 trips on a one-mile section of Washington Street in the Roslindale neighborhood of Boston. At rush hour, they put up with bus speeds that are slower than walking.

The intense traffic congestion can drag out the approximately 1.2 mile-long trip between Roslindale Square and the Forest Hills Orange Line station as long as 45 minutes, according to Andrew McFarland of Boston’s LivableStreets Alliance. Even though buses carry 60 percent of the total number of people moving through the corridor at rush hour, transit has no dedicated street space.

Until this morning.

Bus riders got a dramatically faster ride thanks to a one-day pilot in which Boston DOT and the MBTA converted a parking lane and a bike lane into a bus lane using just orange cones. The "pop-up'' bus lane was in effect from 7 a.m. to 9 a.m. People on bikes were allowed to use the transit lane, while car drivers were not.

Transit riders noticed the difference and have been singing the praises of the bus lane on Twitter:

https://twitter.com/mmm_jackiez/status/940593916084150273?ref_src=twsrc%5Etfw

The experiment shows that the same low-cost approach that cities have used to quickly reallocate street space to walking and biking can also be used to try out transit improvements.

In addition to the cones, MBTA workers were stationed to keep cars out of the bus lane.

"This is an incredibly cost-effective way to move more people more efficiently along our streets without the time and resources required for capital projects," said McFarland. "We've seen a similar pilot roll-out nearby in Everett that needed only four city staff members to operate daily (two public works officials to put down cones and two parking enforcement agents to thwart cars from parking in the lane)."

Today's experiment will be followed by another on Tuesday, then a longer three- to four-week pilot planned for the spring. The spring project will include a bus lane for the p.m. peak (though not as the same time as the morning bus lane), as well as other bus priority treatments like off-board fare collection and stop consolidation, says McFarland.

McFarland says he'd like to see the bus lane made permanent.

"Today is about trying to get riders engaged," he said. "This is what we can have every day if we go to the city and ask for it."

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Eyes on the Street: Caltrans Sidewalk Work on Alvarado

Caltrans $70M State Route 2 Multimodal Project is rehabbing and improving 5 miles of Santa Monica Blvd, Alvarado St., and Glendale Blvd.

December 3, 2025

San Bernardino Could Finally End One of Country’s Worst Zombie Projects: The ONT Connector

“The ONT Connector is an inappropriate investment. Ridership capacity and public transportation utility do not support spending billions of dollars for it. Scrapping the project is the right decision. Electric rail to ONT is the appropriate decision,” per The Transit Coalition

December 3, 2025

Support Streetsblog L.A. Today for a Better 2026

As 2025 comes to a close, we’re asking for your support to keep independent, people-centered transportation journalism alive in Los Angeles.

December 2, 2025

Baldwin Park Update: Progress on Path and Park Projects

The new connection from Walnut Creek Nature Park to the greenway walk/bike path is just about finished, and the huge expansion on Barnes Park is trooping along

December 2, 2025

Tuesday’s Headlines

ICE terror, masked ICE, rents, Koreatown traffic circle, housing, LAX, Culver City, South Pasadena, congestion, car-nage, and more

December 2, 2025
See all posts