Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
SGV

La Verne Pedestrian Bridge Will Connect Metro A Line, Metrolink, and Fairplex

Officials from La Verne and the SGVCOG are excited about the bridge’s “elegant” design and connectivity for transit oriented development.

A rendering of the spiral ramp for the La Verne Regional Multimodal Bridge.


As construction of Metro's A Line light rail extension through the San Gabriel Valley foothills nears completion (01/03/25), SBLA looks forward to an accessory project coming a bit further down the timeline: the La Verne Regional Multimodal Bridge.

An aerial rendering of the La Verne Regional Multimodal Bridge. Note the large, clear cube in various renderings represents future transit oriented development.

The project is a partnership between the city of La Verne and the San Gabriel Valley Council of Governments (SGVCOG). The bridge will be 32 feet high, 1,500 feet long, and 12 feet wide, situated over Arrow Highway between Fairplex Drive and White Avenue.

It will begin beside the La Verne A Line Station on the north side of Arrow, extending southeast to the Fairplex Metrolink Station. The structure will culminate in a spiral ramp (see top photo) beside the site of future transit oriented development on Los Angeles County's Fairplex property. 

Currently, the Fairplex Metrolink stop only operates during the L.A. County Fair. The Fair draws about 750,000 attendees annually, but the Fairplex hosts hundreds of exhibitions year-round. Connecting the much more frequent service Metro light rail line to the Fairplex is a winning idea, especially if you've ever waited an hour in the car line to park at a packed event.

Currently, crossing the roadway here is a busy proposition, between six lanes of the commuter arterial Arrow Highway and train traffic as well. This project will remove that at grade crossing, as well as a portion of the sidewalk on the north side of Arrow.

Arrow Highway facing west beside the Metrolink crossing by the Fairplex Station.
Arrow Highway facing east beside the site of the La Verne Metro A Line Station under construction. Note Google street view only had this point photographed up to November 2023.

Construction is set to begin ahead of the La Verne A Line Station opening in 2025, in tandem with local First/Last Mile improvements around Old Town La Verne and the University of La Verne on E Street and Second Street.

A rendering of the northerly entrance to the La Verne Regional Multimodal Bridge, beside the La Verne A Line Metro Station.

COG officials say that the bridge will have a long and gentle grade for users of all abilities, and will be lit with energy-efficient LED’s. La Verne City Manager Ken Domer tells SBLA that the city is “greatly appreciative of this partnership with the SGVCOG and looks forward to the completion of the project as a benefit to future mobility of visitors and residents in an enhanced and safe manner.”

Per the SGVCOG, the project is funded through a variety of sources including Measure M Subregional Program funds, local Prop C funds, local EIFD funds, a federal earmark secured by Congresswoman Grace Napolitano, and $16 million of SCAG-directed federal Surface Transportation Block Grant Program funds. 

Streetsblog’s San Gabriel Valley coverage is supported by Foothill Transit, offering car-free travel throughout the San Gabriel Valley with connections to the Gold Line Stations across the Foothills and Commuter Express lines traveling into the heart of downtown L.A. To plan your trip, visit Foothill Transit. “Foothill Transit. Going Good Places.”Sign-up for our SGV Connect Newsletter, coming to your inbox on Fridays!

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Measure HLA Minimum Bus/Bike/Walk Requirements Expected to be Approved this Week

The City Planning Department released a revised and somewhat improved draft of its HLA Standard Elements Table, on the agenda for a Thursday vote of the city's Street Standards Committee

April 1, 2025

This Week In Livable Streets

CicLAvia opens streets in central Los Angeles this Sunday! Plus Measure HLA minimums, Metro board, Metro Public Safety, and more

April 1, 2025

Streetsblog Honors Cesar Chavez Day

Streetsblog Los Angeles, Streetsblog San Francisco, and Streetsblog California are off today to recognize Cesar Chavez Day. We will return to normal publication tomorrow.

March 31, 2025

Metro Breaks Ground on G Line Busway Construction

The $668 million project is anticipated to improve G (former Orange) Line BRT end-to-end trips by 12-16 minutes

March 28, 2025
See all posts