Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
    • In Hollywood and DTLA, Construction Causing Problems for Pedestrians (LAT)
    • More on the Systemic Problems Uncovered by Street Services Audit (LAT)
    • Caltrans Seeks TIGER Funds for South L.A. Corridors Study (Wave)
    • L.A. Chinatown Youth Need Better Transit (SEACA YouTube)
    • People Misunderstand the Usefulness of Fast Urban Transportation (Lets Go LA)
    • Email Scammers Posing as EZPass ExpressLanes Toll Collectors (The Source)
    • Two S.F. Transit Crashes Cause 40 Minor Injuries (LAT)
    • Punny Story on Pedestrian Beg Buttons (Yahoo News)
    • Is Santa Monica Ready for Vision Zero? (Santa Monica Next)

Get National Headlines at Streetsblog USA

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

This Week In Livable Streets

Bike Month continues, Metro 91 Freeway widening, Destination Crenshaw, Culver City Bus, Santa Monica MANGo, Metro bike lockers, Metro Sepulveda Transit, and more

May 6, 2024

San Fernando Valley Bus/Bike Updates: G Line, Roscoe Bus Lanes, Laurel Canyon Bike Lanes

Short newly protected bike lane on Laurel Canyon Blvd, extensive NSFV bus improvements under construction this month, and scaled-back G Line plans should get that project under construction this summer

May 6, 2024

No, L.A. City Does Not Always Add Required ADA Ramps During Resurfacing, But They Should

StreetsLA GM Keith Mozee "Any time we do street resurfacing, it is considered an alteration, which requires ADA ramps to be installed."

May 3, 2024
See all posts