Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
StreetFilms

Streetfilms: Massive Turnout to Protect Endangered Brooklyn Bike Lanes

On a grey, chilly Sunday, an estimated 750 people, many of them on training wheels and balance bikes, turned out to ride the Prospect Park West bike lane and show their support for the traffic-calming redesign. Since the two-way, separated bike path debuted last summer, it's become indispensable for many parents who use it to take their children to school and get around the neighborhood. On weekends, the lane is full of families heading to the green market at Grand Army Plaza and kids riding to Prospect Park.

The "We Ride the Lanes" event was the brainchild of Mitch Sonies, who rides the PPW bike lane with his six-year-old daughter and wanted to do something positive to highlight how much people appreciate having a much safer street in their neighborhood. "It was a real celebration of this great, safe bike path," said Mitch. "When I first started kicking around the idea of a family ride, I never imagined so many people would want to take part. It's a real testament to the popularity of the lane."

As you can see, the ride was a hit with families and young children, who filled the entire length of the bike lane for more than 40 minutes as they paraded from Grand Army Plaza to Bartel Pritchard Square. The free cupcakes at the end of the ride didn't last long.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Friday Round-Up: Pico Blvd., Koreatown Circle, and SGV E-Bikes

LADOT installs pedestrian safety upgrades at deadly Ktown intersection. Apply for SGV e-bike vouchers by Monday. LADOT plans major safety upgrades on Pico Boulevard.

November 14, 2025

Friday’s Headlines

ICE, rain, Measure HLA, L.A. River path, 5 Freeway widening, Koreatown, LAX, South Gate, Glendale, car-nage and more

November 14, 2025

City Scrapes Grassroots Koreatown Crosswalks, Plans To Replace

The city will replace guerilla crosswalks with an interim traffic circle and new crosswalks. The delayed permanent traffic circle is expected to installed next year.

November 12, 2025
See all posts