Skip to content
Sponsored

Redondo Beach Installs Curb-Protected Bike Lanes on Palos Verdes Blvd.

The entire 0.6 miles of Palos Verdes Boulevard through Redondo Beach now has a continuous bikeway including 0.4 miles of top-notch curb-protection
5:31 PM PDT on October 26, 2026
Redondo Beach Installs Curb-Protected Bike Lanes on Palos Verdes Blvd.
New concrete-curb-protected bike lanes on Palos Verdes Blvd. in Redondo Beach. Photos by Joe Linton/Streetsblog
LongBeachize_Ad_Concepts
This article is supported by Los Angeles Bicycle Attorney as part of a general sponsorship package. All opinions in the article are that of the author, and do not necessarily reflect those of LABA. Click on the ad for more information.

The city of Redondo Beach recently installed nearly a half-mile of new concrete-curb-protected bike lanes along Palos Verdes Boulevard.

Palos Verdes Drive curb-protected bike lanes
Palos Verdes Boulevard protected bike lanes
Palos Verdes Blvd. bike lanes at Pacific Coast Highway
Map of Palos Verdes Blvd. bike lane project

The 0.4-mile Palos Verdes Blvd. Protected Bike Lane Project extends from Pacific Coast Highway to Irena Avenue. The city reconfigured the street, narrowing existing car lanes, adding new bike lanes, featuring concrete curbs, signage, and green pavement marking in conflict areas.

These curb-protected bike lanes are the gold standard for on-street bike facilities. Redondo Beach installed its first curb-protected bike facility (part of the beach bike path) in 2015. Fewer than a dozen L.A. County cities that have installed similar bikeway protection.

Recently installed unprotected bike lanes on Redondo Beach Blvd. at the Redondo/Torrance city limit

Redondo Beach also recently installed new unprotected bike lanes for two additional blocks of Palos Verdes.

The intersection of Palos Verdes Blvd. and Prospect Avenue. The bike lanes are unprotected, but the city has included some additional modest safety features: painted curb extensions with hard plastic speed bumps, and green pavement.
Palos Verdes Blvd. at Prospect

The entire 0.6 miles of Palos Verdes Boulevard through Redondo Beach now has a continuous bikeway; both ends of Redondo’s bikeway are at the Torrance city limits.

Additional brief Redondo Beach bike news:

Map of multi-city Redondo Beach Boulevard Active Transportation Corridor project – via 2024 presentation

Streetsblog has migrated to a new comment system. New commenters can register directly in the comments section of any article. Returning commenters: your previous comments and display name have been preserved, but you'll need to reclaim your account by clicking "Forgot your password?" on the sign-in form, entering your email, and following the verification link to set a new password — this is required because passwords could not be carried over during the migration. For questions, contact tips@streetsblog.org.

More from Streetsblog Los Angeles

This Week In Livable Streets

October 26, 2026

Monday’s Headlines

October 26, 2026

Eyes on the Street: New Bike Lanes on Lankershim and near Expo Park

October 23, 2026

Friday’s Headlines

October 23, 2026

GoSGV Offers Five More Electric Cargo Bikes for Equity Members

October 22, 2026
See all posts