Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Metro

Eyes on the Street: Metro Installed New Bollard Protection on First Street Bike Lane

A couple of blocks of new plastic bollards might not look like much, but it just might mean that Metro and LADOT are planning to make good on missing bike/walk connections to Metro's new subway stations

Metro recently added new bollard protection to the eastbound bike lane on First Street. Photos by Joe Linton/Streetsblog

It looks like Metro is beginning to make good on improving first/last mile bike facilities that were supposed to link Metro riders with new Regional Connector stations. In the last few weeks, Metro added new plastic bollard protection to the eastbound bike lane on First Street between Alameda Street and Vignes Street, just east of Metro's new Little Tokyo Station.

Streetsblog and LADOT (L.A. City Department of Transportation) noted the installation of the unprotected bike lane after Metro installed it in late 2022. After the Regional Connector subway opened in May, Streetsblog reported that Metro omitted and downgraded several planned station bike/walk connections, while Metro Connector project construction widened roads and added new car lanes and new parking for drivers. Advocates urged Metro and the city to fix the missing first/last mile facilities, including several places where bikeway protection had been omitted.

Could the new bollard protection on First Street be an early step in Metro and LADOT making good on planned Regional Connector first/last mile safety improvements? Time will tell.

New plastic bollards protecting the eastbound First Street bike lane, which runs next to the Metro E Line tracks in Little Tokyo

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Metro and Caltrans Break Ground on 105 Freeway Expansion

105 Freeway expansion is touted as "leaving a lasting legacy for Angelenos for decades to come" but it might not be the legacy that Metro and Caltrans think it is

April 25, 2025

Metro LAX Transit Center Station to Open June 6

The LAX Transit Center will serve the C and K light rail lines, connect to the future LAX people mover, plus includes bus/bike/walk hubs

April 24, 2025

Eyes on the Street: New Protected Bike Lane on San Vicente Blvd

San Vicente's new stretch of parking-protected bike lane extends a half mile, from Keniston Avenue to Redondo Boulevard

April 23, 2025
See all posts