Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
LongBeachize

DTLB Adds Bar & Zip Code Crosswalk to Long Beach’s Collection of Creative Crossings

Photo by Daniel Brezenoff

There's been rainbows and piano keys and even tessellation artwork used to designate crosswalks throughout Long Beach.

Well, the peeps over at Studio One Eleven have eschewed all of the above, opting for a cleaner, if not more outright wittier interpretation: a bar code that uses the DTLB zip code as its number source.

Sitting at the intersection of 3rd and Promendade at the southern foot of The Streets DTLB—the massive development formerly known as City Place and undergoing one of the largest revamps in the city—the crosswalk is charming, smart, and unlike many of its counterparts, refreshingly design-centric.

"The crosswalk represents a playful retail bar code with the numbers being 90802-Downtown's zip code—as an ode to both the retail roots of The Streets and our new home," said Michael Bohn, principal at Studio One Eleven.

While crosswalks are typically marked with zebra markings—simple white and black lines—creative crosswalks serve two larger purposes. The most obvious is the artistic flair they add to the environment; simply put, they’re fun. But more importantly, they increase pedestrian safety and awareness. Pedestrians are more likely to use the crosswalks rather jaywalk and cars are more likely to slow down when approaching colorful, creative designs on the road than the typical, monochromatic crossings they are used to seeing daily.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

What’s Next for Measure HLA, in the Face of Metro Opposition?

This is probably something a judge would need to decide at some point

March 21, 2025

Metro Lawyers Up Against Measure HLA, Tells L.A. City that Metro Projects Don’t Require Planned Bus/Bike/Walk Improvements

Metro: "any attempt to enforce [Measure HLA] against Metro is beyond the City's legal authority, and Metro will challenge any such attempt."

March 19, 2025

Metro Tests Foothill A Line Extension, Authority Prepares to Construct Next Segment

Emergency drills are being practiced and vital systems double checked while a final price tag and start date are being worked out for Pomona to Montclair.

March 19, 2025
See all posts