Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Streetsblog CA

Damien Talks Episode 3: Oakland’s Uber Advocate Chris Kidd

Welcome to the third episode of Damien Talks, our podcast about the people and politics behind the Livable Streets Movement throughout California. Our first month broadcasting coincides with Bike Month, so we’ve been working up the coast, talking to bike advocates throughout the state. 

Chris rides off into the sunset from LADOT in 2011. Image: ##https://ladotbikeblog.wordpress.com/2011/07/29/the-bike-blog-it-is-achanging-christopher-kidd-out-jojo-pewsawang-in/##LADOT Bike Blog##
Chris rides off into the sunset from LADOT in 2011. Image: ##https://ladotbikeblog.wordpress.com/2011/07/29/the-bike-blog-it-is-achanging-christopher-kidd-out-jojo-pewsawang-in/##LADOT Bike Blog##
false

This week, Damien Talks with Chris Kidd, a board member with CalBike and Walk Oakland Bike Oakland. When he’s not being one of the state’s leading advocates, he has a day job with Planning super group Alta Planning and Design. Longtime readers of Streetsblog Los Angeles may also remember Chris as the first editor of the LADOT Bike Blog.

This week’s Damien Talks is taking part in a special week devoted to looking at how a new Department of Transportation could change things in Oakland.

We’re always looking for sponsors, show ideas, and feedback. You can contact me at damien@streetsblog.org, at twitter @damientypes, online at Streetsblog California or on Facebook at StreetsblogCA.

Thanks for listening. You can download the episode at the Damien Talks homepage on Linksyn.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Freeway Updates: 91 Widening, Repave 405, and 105 Safety Fixes

A Metro/Caltrans 91 Freeway expansion project is on hold. Caltrans 105/Studebaker safety enhancements are complete. Caltrans is planning $144M worth of repaving and upgrading for the 405 through the Sepulveda Pass.

April 22, 2025

This Week In Livable Streets

Metro board, Transportation Committee, Repave 405, and more

April 22, 2025

Deadline For Input on SGV Greenways Implementation Plan is Saturday

The 200+ page document provides a comprehensive look at how the region’s flood control channels can be remade into walk/bike paths

April 21, 2025
See all posts