Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Events

High Desert Corridor Project Update

10:01 PM PST on November 25, 2012

The High Desert Corridor is Moving Along

The project proposes to link SR-14 in Los Angeles County with SR-18 in San Bernardino County. This connection would link some of the fastest growing residential, commercial, and industrial growth areas in Southern California, including the cities of Palmdale, Lancaster, Adelanto, Victorville and the Town of Apple Valley.

The Draft Environmental Impact Statement/Environmental Impact Report is expected to be available for public review late 2013.

Join Us to Learn the Latest

You're invited to attend an open house to hear about the latest project developments, including the most recent Metro Board action recognizing the HDC as a Strategic Multipurpose Corridor that can potentially accommodate a highway, a green energy production and/or transmission facility and a high speed rail feeder service line with potential connections to the Metrolink station in Palmdale and an XpressWest Station in Victorville.

Please attend the meeting that is most convenient for you; the material presented in all meetings will be identical.

Meeting Times
Wednesday, December 5, 2012 6-8pm
Lake Los Angeles Elementary School
16310 E Avenue Q
Palmdale, CA 93591

Thursday, December 6, 2012 6-8pm
Stater Bros Stadium
Mavericks Conference Room
12000 Stadium Rd
Adelanto, CA 92301

Monday December 10, 2012 6-8pm*
Endeavor School of Exploration
12403 Ridgecrest Rd
Victorville, CA 92395

Tuesday, December 11, 2012 6-8pm*
Larry Chimbole Cultural Center
Joshua Room
38350 Sierra Hwy
Palmdale, CA 93350

*Meetings will be streamed live via the internet. To participate, please go to ustream.tv/channel/metro-high-desert-corridor.

For official meeting notice Click Here.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Friday Bikeways Update: Beach Bike Path Damage, 7th Street, and More

Updates on: beach bike path in Pacific Palisades, Michigan Greenway in Santa Monica, Parthenia Place in North Hills, 7th Street Streetscape in DTLA, and Imperial Highway near LAX

March 1, 2024

Measure HLA Fact Check: Sidewalk Costs

The city says $200 million worth of annual ADA work is "included in the cost" of Measure HLA, but the city is already on the hook for that ADA work anyway, so none of it should be included as HLA costs

March 1, 2024

Supervisor Hahn Calls for No Residential Demolitions in Metro’s 710 Freeway Corridor Project

"[For 710 Freeway expansion] Metro needs to commit itself to zero residential property takes. [Metro] should have as one its top priorities ensuring that our projects do not result in kicking people out of their homes."

February 29, 2024
See all posts