Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
bicycle lanes

Culver City Plans Protected Bikeway on Overland Avenue

Culver City's proposed ~2.5 mile Overland bike facility is mostly new protected bike lanes (about a mile and a half), plus about a half-mile of new unprotected bike lanes at the north end, and a short stretch of bike route at the south end.

Culver City is planning protected bike lanes for much of Overland Avenue. Photo via Google Street View

LongBeachize_Ad_Concepts
This article supported by Los Angeles Bicycle Attorney as part of a general sponsorship package. All opinions in the article are that of the author, and do not necessarily reflect those of LABA. Click on the ad for more information.

Culver City is currently in the design phase for a project that would add protected bike lanes along Overland Avenue, Playa Street, and Hannum Avenue. Next month the city will host a community input meeting on the Overland Bike Lane Project - meeting details below.

The project would extend existing bike lanes on Overland that were installed circa 2019, covering about a half-mile between Culver Boulevard and Ballona Creek. The proposed new bikeway would be about 2.5 miles long - from Overland and Venice Boulevard to Hannum and Slauson Avenue.

The design varies somewhat for different parts of Overland, Playa, and Hannum, with the lion's share (about a mile and a half) being new protected bike lanes. The project would include about a half-mile of new unprotected bike lanes at the north end, near Venice Boulevard. It also includes a short stretch of bike route connecting to the Culver City Transit Center on Slauson near Sepulveda Boulevard.

City's map showing Overland bikeway project features - via project webpage

Though much of the facility fits without changing the current space allocated for car lanes or car parking, some stretches would narrow car lanes and/or reconfigure some on-street parking (including significant parking removal, mainly in areas that have off-street parking lots).

Detailed project street plan example - see full proposal

See full detailed proposed plans at the city's project webpage.

Learn more about the proposal, and give your input, at a community meeting next month: Wednesday, September 13 from 7-9 p.m. at the Veterans Memorial Building, Rotunda Room, at 4117 Overland Avenue.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Metro and Caltrans Planning to Widen 405 Freeway through Carson, Meetings this Week

Between Wilmington Avenue and Avalon Boulevard, Metro and Caltrans are looking to add four new freeway lane sections at a construction cost totaling at least $90-120 million

September 19, 2024

Wednesday’s Headlines

Hollywood bike lanes, 14 Freeway expansion, Southeast Gateway Line, Brightline, Carnage and more

September 18, 2024

Don’t Get Doored – Rosemead Blvd Bike Lanes Need Your Input

Caltrans is taking input on its repaving and possible reconfiguration of Rosemead Boulevard in South El Monte, via a survey and a public workshop.

September 17, 2024

On a Roll: Feds Inch Closer to Finally Achieving Key Goal of Americans With Disabilities Act

The 34-year-old Americans With Disabilities Act may soon — finally — give pedestrians, people in wheelchairs or parents pushing strollers true equality in the public right of way

September 17, 2024

Tuesday’s Headlines

West Hollywood approves bike/walk safety funding, plus Culver City, Highway 14, rail car lawsuit, Inglewood, Monrovia, Glendale, San Fernando path, and Metrolink

September 17, 2024
See all posts