Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
    • RFP Released For Teardown of Terminal Island Freeway (LongBeachize)
    • Skepticism About Great Streets, Better to Widen to Reduce Congestion (LAT)
    • Carnage: Koreatown Multi-Car Hit-and-Run Crash Driver Flees on Foot (LAT)
    • Planning South East L.A. Multi-City CicLAvia Not Easy (LA Register)
    • Graphics: Discrepancies Between Metro Ridership Estimates and TAP Cards Tapped at Stations (LAT)
    • Metro Approves $4M Pedestrian Bridge for Regional Connector (Downtown News)
    • Caltrans to Add 14-Mile Toll Lane to 405 Freeway Through OC (LAT)
    • Gold Line Foothill Extension Construction On Target For Late 2015 Opening (LA Register)
    • Man on Bridge Shuts Down 5 Freeway During Friday p.m. Commute (LA WeeklyLAT)
    • Closure Due To Unexpected Cracks on 405's Mulholland "Carmageddon" Bridge (The Source)
    • Chicago DOT Proposes City's First Curb-Protected Bike Lanes (SB Chicago)
    • NYC Tunnels: For the Real Picture, Count People Not Vehicles (SB NYC)
    • A Look At How Well Free Public Transit Works (Salon)

Get National Headlines at Streetsblog USA

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

L.A. Union Station Run-Through Tracks Complicated By Vernon Challenge

Much needed improvements now face potential cost increases and delays over a planned relocation of a short stretch of private rail storage tracks

October 17, 2025

Metro To Open D Line Subway Extension By March 2026

The 4-mile Metro D Line Extension Section 1 will extend from Wilshire/Western in Koreatown to La Cienega/Wilshire in Beverly Hills

October 15, 2025

Huntington and Fremont to get Complete Street Redesigns in South Pasadena

Early concepts portray lush, green streets - with pedestrian, bike, and bus facilities.

October 14, 2025
See all posts