Pedestrian Safety
Streetsblog LA
Missing Metro Regional Connector First/Last Mile Facilities Worse Than Reported Earlier
Metro and LADOT quietly omitted and downgraded extensive bike and walk improvements approved and funded for Little Tokyo - in addition to omissions at Grand and Broadway stations
July 21, 2023
The Danger of School Streets in One Completely Avoidable Tragedy
The moral of our story is to never give up. Your community deserves nothing less. And activism can bring about real change.
Isaac Gonzalez
July 10, 2023
Now Is The Time To Speak Up For Safer Vehicles
Pedestrian deaths set a 41 year record in the U.S. last year. Here are five ways you can take action to stop the bloodshed right now.
Ben Crowther
July 9, 2023
Santa Monica’s New 17th Street Curb-Protected Bike Lanes are Amazing
Nearly completed, Santa Monica's excellent 17th Street bike/ped improvements include Southern California's first European-type curb-protected intersections
July 6, 2023
Eyes on the Path: Metro Posts First Look at Slauson Corridor Bike/Walk Path Ahead of Tonight’s Construction Update
Tonight, Metro will host a construction update on the 5.5-mile Rail-to-Rail walk/bike path that will run along the neglected Slauson corridor right-of-way
May 17, 2023
Eyes on the Street: Angelino Heights Anti-Racing Roadway Redesign Nearly Complete
LADOT and CD1 improved the project's mostly just plastic bollards, added lots of 'wheel stops' - basically low plastic curb/bumps
May 12, 2023
Eyes on the Street: Crosswalk Collective Makes Safer Routes to School
The project features two new crosswalks near schools, plus the first use of the collective's new feature: a "STOP" stencil
May 9, 2023
Give Input on Designs for Walk/Bike Upgrades on Eagle Rock Boulevard
The city is currently seeking input on three proposed options: protected bike lanes, European design curb-level protected lanes, and a ridiculous center-running bikeway
April 28, 2023
Showdown Looms Over Successful Culver City Bus/Bike/Walk Improvements
Culver City opted to install low-cost quick-build walk/bus/bike upgrades exactly where they are most needed - in its walkable historic downtown, connecting to its E Line station. The improvements are now under threat.
April 21, 2023
Foothill Gold Line: Bridge and Crossing Construction Done Up to Pomona
Grade crossings? Done… Bridges? Built... Funding to make it to Montclair? We’ll see about that.
April 12, 2023