Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Streetsblog USA

Vancouver Set to Claim Another Bridge Lane for Active Transportation

City officials want to add another bike lane to the Burrard Bridge. Image: Vancouver
Vancouver officials want to remove a car lane on the Burrard Bridge to make room for a walking path. Image: City of Vancouver
false

In 2009, Vancouver converted a southbound car lane on the west side of the Burrard Bridge to a protected bikeway using concrete dividers, freeing up the sidewalk for pedestrians. On the east side, the city converted the existing sidewalk into a bike path.

The bridge, pre-bike lane, via Wikipedia
The bridge, pre-redesign. Photo: Wikipedia
false

The three-month experiment defied predictions of carmageddon and became a permanent fixture. Thanks to the protected lane and an overhaul of the intersection on one end of the span in 2013, the Burrard Bridge has become "the city’s most popular bike route," according to Metro.

According to the city, the bridge handled about 300,000 bike trips per month between September and November last year.

Now, six years after the first change, Vancouver is looking to remove another car lane to open up room for a walking path on the east side, and to redesign the intersection at the other foot of the bridge to reduce conflicts between drivers, cyclists, and pedestrians. The main part of the span would have four car lanes and dedicated paths for walking and biking in each direction, compared to six car lanes and narrow, mixed-use paths before the 2009 redesign.

Burrard is one of three key bridges into downtown Vancouver, which is situated on a peninsula. Built in 1933, it is scheduled for structural repairs and maintenance in 2016 and 2017. In addition to repurposing space from driving to walking in the center of the span, the city's plan calls for turn lanes on the east side that will widen the structure.

Vancouver presented the new plans for the bridge at a public meeting yesterday. Here's a look at the intersection redesign proposed for the north end of the bridge:

burrard_north_after
Image: City of Vancouver
false
burrard-north
Photo: Google Maps
false

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Thursday’s Headlines

LAPD, potholes, green bike lanes, Metro policing, L.A. River, car-nage, and more

January 15, 2026

Metro Committee Approves Sepulveda Rail Alignment, Postpones Torrance Rail Approval

Plus: Metro announces a testing snag which means a likely delay for the D Line opening, and supports Foothill A Line extension to Claremont

January 14, 2026

Wednesday’s Headlines

ICE, LAX roadway expansion, Sepulveda subway, MLK parade, Pasadena, car-nage, and more

January 14, 2026

Tuesday’s Headlines

ICE, Sepulveda and Torrance Metro rail, Rail2Rail path, care-based services, Olympics, Measure ULA, Monrovia, Little Tokyo, car-nage, and more

January 13, 2026

This Week In Livable Streets

Metro board committees, Satoru Tsuneishi Park opening, Santa Fe Dam ride, and more

January 12, 2026
See all posts