accessibility
Streetsblog LA
L.A. Upgrades Manchester Blvd Bike Lanes, Closing Gap
During resurfacing, the city appropriately closed a gap in its protected bikeway network through Westchester, as approved in the city's Mobility Plan - but sidewalks there remain heavily damaged
August 27, 2024
No, L.A. City Does Not Always Add Required ADA Ramps During Resurfacing, But They Should
StreetsLA GM Keith Mozee "Any time we do street resurfacing, it is considered an alteration, which requires ADA ramps to be installed."
May 3, 2024