Metro
Streetsblog LA
LADOT Moves to Make Trains Move Faster on E Line, but Hasn’t Considered Signal Preemption
LADOT is working on improving the run-times of the oft-delayed and slow-moving E Line trains
February 12, 2020
SGV Connect 57: Metro’s Plans for Buses and the Gold Line Eastside Extension
Learn about Metro's plans to extend the Eastside Gold Line, and Metro's systemwide NextGen bus network redesign
February 7, 2020
Destination Crenshaw to Break Ground February 29
On February 29, community leaders will gather at Vernon and Crenshaw to break ground on the 1.3-mile-long public art project that will celebrate Black life, culture, and contributions
February 5, 2020
Metro NextGen Bus Study Meetings Start Tomorrow
Overall, Metro's NextGen bus network redesign will be an important step in the right direction. Political pressure is needed to make sure it's as big a step as possible.
January 31, 2020
Thirteen Fun Family-Friendly Bike Rides Accessible Via Metro Transit
Parents can take their kids on Metro rail (or BRT) to get to these family-friendly bike paths
January 29, 2020
Eyes on the Street: Electric Chargers on the G (Orange) Line
Metro G Line will run electric buses by mid-2020. Charger construction appears about complete at North Hollywood.
January 27, 2020
Periodo de Comentario Público sobre Dorset Village Extendido; Número de Unidades Asequibles Cae a 141
Hace dos semanas, el Departamento de Planificación de la ciudad de Los Ángeles (DCP por sus siglas en inglés) discretamente extendió el periodo de comentario sobre su Estudio Inicial con respecto a la demolición y reconstrucción de Dorset Village, hasta el 6 de febrero.
January 23, 2020
Metro Board Votes to Study Free Transit for LAUSD Students
The Metro board approved a motion to study free student transit - initially for LAUSD students, then also countywide.
January 23, 2020
Metro Plans Nearly Two-Year-Long Little Tokyo Gold Line Bus Bridge For Regional Connector Construction
Metro will demolish the existing Little Tokyo Gold Line Station for a new underground station. Construction means closing 1.2 miles of the Gold Line, running a 22-month bus bridge, expected to start late 2020
January 16, 2020
Public Comment Period on Dorset Village Extended; Number of Proposed Affordable Units Dropped to 141
The original comment period straddled Thanksgiving, Hanukkah, Christmas, and Kwanzaa before closing on December 27.
January 14, 2020