Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Events

Metro Long Range Transportation Plan Meeting: San Gabriel Valley

For a copy of the draft Long Range Transportation Plan, visit www.metro.net.

Those unable to attend the community meetings can e-mail their comments to metroplan@metro.net or write their comments, to Los Angeles County Metropolitan Transportation Authority, Countywide Planning & Development, One Gateway Plaza, Mail Stop 99-23-2, Los Angeles, Ca 90012 Attn: Robert Cálix. All comments need to be postmarked and submitted by April 25. Following the public comment period the Metro Board will consider adoption of the Long Range Transportation Plan in June.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Grand Opening of Transformative Rail-to-Rail Bike/Walk Path on Slauson Brings Community Out to Play

The $166M project was a dozen years in the making. South Central residents and electeds alike hope it is a foundation on which even better things can be built for the community.

May 22, 2025

Metro Quietly Withdraws Lyft Bike-Share Contract Vote

The current twice-botched will-they-won't-they procurement process is not doing Metro Bike Share any favors.

May 22, 2025

SGV Hikes and Bikes: Duck Farm River Park

Tucked in the crook of the 605 and Valley Boulevard is some much needed breathing room for the East Valley.

May 22, 2025

Eyes on the Street: Another Long Beach Development-Triggered Bike/Bus Improvement

Long Beach Boulevard has a new protected bike lane that runs at curb-level behind a new bus shelter.

May 20, 2025
See all posts