Promoted
Freeway Updates: 91 Widening, Repave 405, and 105 Safety Fixes
A Metro/Caltrans 91 Freeway expansion project is on hold. Caltrans 105/Studebaker safety enhancements are complete. Caltrans is planning $144M worth of repaving and upgrading for the 405 through the Sepulveda Pass.
Deadline For Input on SGV Greenways Implementation Plan is Saturday
The 200+ page document provides a comprehensive look at how the region’s flood control channels can be remade into walk/bike paths
Caltrans Posts Draft Master Plan for PCH in Malibu
Activists agree this plan is a huge improvement over current conditions, but there are some areas where it could be even better.
New Bike Lanes on Mission Road and Bonnie Brae Street
New bike lanes are complete on Westlake's Bonnie Brae Street. New partially-protected bike lanes are being installed on Mission Road in Boyle Heights.
Eyes on the Station: Fortified Fare Gates Now Arriving at Metro Stops
Streetsblog visited Pasadena's Metro A Line Lake Street Station and brings you photos of the new fare gates. Metro is installing more secure gates at more than a dozen rail stations.
City Transportation Department Launches Required HLA Website, but It’s Problematic
LADOT's Measure HLA dashboard shows just seven projects, all of which LADOT claims are exempt from Measure HLA requirements
City Committee Approves HLA Minimum Standards, Requests Clarification for Crosswalks
A year after voters approved Measure HLA, the city approved its HLA Standard Elements Table which clarifies what minimum features will be included in bus/bike/walk facilities
SGV Connect 135.2 – Memories of El Monte and The People’s Cafe
Last week, Chris visited the mutual aid group Memories of El Monte's bi-weekly food distribution at the Klingerman Apartment projects in South El Monte to interview group members and get an update on the construction of their physical location, The People's Cafe.
SGV Connect 135.1 – An Update on the Foothill Gold Line Construction Timelines
Earlier today, Damien Newton sat down with Gold Line Foothill Construction Authority CEO Habib Balian to discuss how a too-high bid will lead to a delay on Gold Line construction to Montclair