Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
LADOT

In NELA, D.I.Y. Sharrows Remain, But L.A. Is Moving On

Photo: Carter Rubin
Photo: Carter Rubin

Yesterday, Carter Rubin and I were in Northeast L.A. on our way to a meeting at Occidental College and we had a chance to stop in and visit with Josef Bray-Ali st the Flying Pigeon Bike Shop (see ad on the right).  I commented that the "D.I.Y. Sharrows" that appeared along some local streets connecting the Gold Line Station with Figueroa street were finally taken up.  LADOT had promised to remove the road markings when they were put up, one year and a couple of days ago, but Bray-Ali pointed out I was wrong.  "They're still there, they're just faded."

And he's right.  A quick trip down the block showed Sharrows as far as the eye could see.  While we could use this opportunity to roll our eyes at LADOT and Bureau of Street Services for not being organized enough to blast these Sharrows off the street, it provides a chance to reflect that our city has made some real strides towards livability.

When these Sharrows were put down, they weren't just a slap in the face to the city for failing to follow through on their promise to bring Sharrows to Los Angeles, but also a challenge for the city to finally get serious about starting to make the city a safer place to bike.  While I wouldn't say that LADOT or the city has embraced the challenge, a lot has happened since then.

Bike lanes have sprouted in South L.A., the San Fernando Valley and, last week, on York Boulevard just a couple of miles from where the D.I.Y. Sharrows sit.  While it's still eye-rolling that they're making Cafe de Leche' pay for it themselves, the city agreed to let them "pilot" a bike corral.  Official Sharrows have popped up on six streets.  Heck, even the LAPD is starting to treat cyclists like human beings and not like kids playing with toys.  Last, while it's far from perfect, the Give Me 3 campaign has been fun and increased visibility.

I'm not saying Los Angeles doesn't have a long way to go to join Portland, Minneapolis, Long Beach, New York or San Francisco; but compared to the first two years Streetsblog published; 2010 has proved itself to be a year where some things were finally getting done.

And, cyclists didn't have to do it all themselves.  Well, at least most of the time.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Brightline West Breaks Ground on Vegas to SoCal High-Speed Rail

Brightline West will be a 218-mile 186-mile-per-hour rail line from Vegas to Rancho Cucamonga - about 40 miles east of downtown L.A. - expected to open in 2028

April 23, 2024

This Week In Livable Streets

Active Streets Mission-to-Mission, LAPD reports on its use of force in 2023, Pasadena Transit plans, Metro subway construction, and more

April 22, 2024

CicLAvia Opens Venice Boulevard – Open Thread

CicLAvia opened six miles of Venice Boulevard - from Culver City Station to Venice Beach

April 22, 2024
See all posts